Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6260

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the insert-headers-and-footers domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6260
HFH - Hanoi French Hospital - HBP Group HFH - Hanoi French Hospital - HBP Group
Project Description:

Phase 1 of the project, a new build of 25,380m2 general hospital that consists of 170 beds and 8 operating theatres and was completed in 2019. Phase 2 is the renovation of the existing 3,000m2 Hospital and linking it to the new facility.

HBP Services:

Project Management, Cost Management/ Quantity Surveying, Structural & Civil Engineering Design, Mechanical, Electrical, Fire & Hydraulic Engineering Design & Construction Management

Completion Date:

Building B: 2019
Building A: 2021

 

 

 

 

 

“The Hanoi French Hospital (HFH) is the second truly recognized international standard hospital designed and managed by HBP in Vietnam. HFH has been operating in Vietnam since 1994. In 2016 HBP was engaged to undertake the engineering design and assist with the architectural design of the facility. What has made the project particularly interesting was the combination of new build, temporary area construction, refurbishment and reinstatement of temporary areas within a fully operational hospital environment. The phase 2 project was completed in 2021.”

 

hfh-120x120