Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the insert-headers-and-footers domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121
Avery Dennison - HBP Group Avery Dennison - HBP Group
Project Description:

The project was for the complete refurbishment of a 28,000m² GFA Factory in Long Hậu Industrial Park, Long An.

HBP Services:

Project Management, Cost Management, Architectural and Design, Engineering Design, Construction Management

Completion Date:

August 2018

 

 

 

 

Client Testimonial

“HBP fast-tracked the design process to be able to tender the project in 3½ months after engagement and was able to have parts of the factory in operation in 4 months after awarding the construction contracts.”

Steve Smith
Operations Manager

avery denninson