Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the insert-headers-and-footers domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hbpasia/public_html/wp-includes/functions.php on line 6121 Nestlé Distribution Facility - HBP GroupNestlé Distribution Facility - HBP Group
The Nestle Distribution facility was one of the first projects of its type in Vietnam in that it’s structure was a build-to-suit and lease-back arrangement with a local developer. HBP was engaged to represent the interests of Nestle during the process but was also able to manage the expectations of both parties to ensure the success of the project. The GFA of stage 1 is 35,000 m2, and the project is located in Dong Nai, Vietnam.
HBP Services:
Due Diligence, Architectural, Engineering Design Review, Fire Protection Design and Construction Management